If a SOIC-16 precision resistor array with 0.1% accuracy and 15 ppm/°C in a BOM stalls production due to a 26-week lead time, the project is dead. Instead of waiting, it's better to complete domestic substitution validation—a practical route starting today that moves the "domestic substitution validation process" from a conceptual spreadsheet to a mass production line.
When global leading manufacturers stretch delivery schedules into a 26-week "death line," the domestic window becomes particularly prominent: the same specifications can be delivered in just 4-6 weeks, giving R&D a time advantage, not just a price advantage.
2025 Mainstream Supply Cycle Comparison (Weeks)
Extract key indicators for imported part number NOMC16031003FT5: resistance 10 kΩ, four-way matching, 0.1% tolerance, 15 ppm/°C, rated power 0.125 W. Through a three-step screening of "parameter filtering → package confirmation → cost ranking," quickly establish a preliminary screening table.
Using the four-wire method + environmental chamber scripts, sample at two points: 25 °C and 85 °C. Complete noise, temperature drift, and long-term drift data packaging for 200 samples within 2 hours.
Pad Checklist
Process Optimization
Pass high temperature and high humidity 85 °C/85 %RH, 125 °C high temperature aging, and thermal cycle testing. ΔR/R